Tuesday, April 28, 2009

Controlling Time



I discovered that Lucky Charms now includes marshmallows with time control. Sorry bro, I picked them all out of the box.
9 Days till Project is Due
25 Days till Project is Due

Sunday, April 26, 2009

Site Flyover

These are just a couple quick (but took way too long to render) videos to see the whole site before I begin the final design of it.


Site Analysis from Tyler Selby on Vimeo.


Site + Gap in Building from Tyler Selby on Vimeo.

Thursday, April 23, 2009

Sun Analysis

In these two videos I am looking at the way the building will shade the park area. This will affect how i develop the use of the park and how it interacts with the building.




Film Center Project - Sun Analysis 1 from Tyler Selby on Vimeo.


Film Center Project - Sun Analysis 2 w Gap from Tyler Selby on Vimeo.

The Moment

Wednesday, April 22, 2009

Timber Stats

existing-structure-analysis-of-how-many-joists-there-are444

Our project is set inside an old warehouse in Dumbo, NY.  This warehouse uses Timber construction which I plan on reusing in my project.  Using a very poor photo from when I visited the site I did a study last night of the existing interior construction.  This lead to a break down of how much timber is possibly available.

A total of 4 different types of timber are used in building.  A post, 2 beams, and the final decking.

untitled
One Module dividing the whole bay using the column grid.

AutoSave_making a model 6-3-2-aftermodel- working with site2

This model is a mess, but you can see how the floors operate.

2 AutoSave_making a model 6-3-2-aftermodel- working with site3

Timber Piece Size Quantity (bay 3 only) Total Linear Ft Use
(4 Stories Tall)
Post 1’x1’x11’ 298 2,980 ft 4 Floors
Primary Beam 1’x1.5’x11.5’ 298 3,427 ft 3 Floors + Roof
Secondary Beam 4”x12”x18.75’ 3975 74,531 ft 3 Floors + Roof
Deck 4”x14”x11.5’ 5088 58,512 ft 3 Floors

*The ground floor uses the ground instead of timber and the roof uses thinner decking.

Its been along time.

It has been a couple months since I posted anything, but I am going to start back up again as a way to record the last couple of weeks of my studio project.  With the stress and lack of sleep I am going to see if the blog can manage to remember and represent the output.  I will fill in the major details on the project as I have time but I will post a completed process book at the end also.  So here it begins…..

Monday, January 19, 2009